Effwa Infra Bags Significant ₹44.30 Crore Zero Liquid Discharge Project from JSW JFE Electrical Steel
The contract involves the meticulous design, engineering, supply, supervision of installation, commissioning, and subsequent operation & maintenance (O&M) of a state-of-the-art Zero Liquid Discharge (ZLD) based Effluent Treatment Plant (ETP). ZLD systems are paramount for modern industries aiming to drastically minimize their environmental footprint by treating and reusing wastewater, effectively eliminating liquid discharge. This project not only highlights JSW JFE Electrical Steel’s dedication to eco-friendly operations but also firmly positions Effwa Infra at the forefront of India’s push for sustainable industrial growth and water resource optimization.
Key Contract Details:
- Client: JSW JFE Electrical Steel
- Project Scope: Comprehensive Zero Liquid Discharge (ZLD) Effluent Treatment Plant (ETP)
- Total Contract Value: ₹44.30 Crores + GST @ 18%
- Execution Timeline: 12-15 months from effective date for plant execution
- O&M Duration: 3 years post commissioning
The total contract value comprises ₹37.30 Crores for the supply and services related to execution, with an additional ₹7.00 Crores allocated for the three-year operation and maintenance phase. This long-term engagement not only provides a robust revenue stream but also solidifies Effwa Infra’s reputation as a reliable and innovative partner for advanced environmental solutions. As regulatory pressures and corporate environmental responsibilities grow, demand for such specialized expertise is surging. Investors and industry watchers will undoubtedly view this substantial order as a strong indicator of Effwa Infra’s strategic positioning and bright future in the ever-expanding green technology market.